You are here:   Home  /  The Building  /  Entitlement Process Begins
  • Pier 1 Project Schedule

Entitlement Process Begins

City and County of San Francisco Planning Department issued final negative declaration.

Pier 1 required compatibility with plans and policies, agencies with oversight, including:

  • San Francisco Planning Code
  • City and County of San Francisco Master Plan
  • Waterfront Land Use Plan (Waterfront Plan)
  • San Francisco Port Commission
  • San Francisco Planning Department Office of Environmental Review
  • City and County of San Francisco, Design Advisory Committee
  • City and County of San Francisco, San Francisco Port Commission
  • San Francisco Bay Conservation and Development Commission (BCDC)
  • U.S. Army Corps of Engineers
  • California State Lands Commission
  • San Francisco Bay Regional Water Quality Control Board
  • Landmarks Preservation Advisory Board
  • San Francisco General Plan Noise Protection Element
  • San Francisco General Plan Community Safety Element
  • California Department of Fish and Game
  • California Occupational Safety and Health Organization (Cal/OSHA)
  • San Francisco Building Code
  • Secretary of the Interior Standards for Rehabilitation and Guidelines for Rehabilitating Historic Buildings
  • Golden Gate Bridge, Highway and Transportation District
  • San Francisco Municipal Railway (MUNI)
  • Bay Area Air Quality Control District
  • Waterfront Design Advisory Committee

Related projects relevant to the Pier 1 (according to the CEQA Negative Declaration):

  • Ferry Building
  • Downtown Ferry Terminal Project (Terminal Project)
  • Renovation Project
  • Waterfront Transportation Projects (WETA)
  • Reconstruction of the Mid-Embarcadero between Folsom Street and Broadway
  • Mid-Embarcadero Open Space Design
  • Extension of MUBI F-Market Historic Streetcar Line
  • Relocation of MUNI Bus Layover Site
  • Parking Garage at Drumm and Washington Streets

Fun Facts and Constraints:

  • Special status species that have the potential to occur in the Pier 1 study area:
    • Winter-Run Chinook Salmon
    • Central California Steelhead
    • Double-Crested Cormorant
    • California Least Tern
    • California Brown Pelican
    • American Peregrine Falcon
    • California Sea Lion
    • Harbor Seal
  • Total Pier 1 Bay Fill (over covering of area formerly open water): 7,510 square feet
  • Required pile removal and replacement would affect “filter feeder organisms” such as mussels, sponges and tunicates—these were not considered significant impacts as they quickly reestablish themselves
  • Pile removal and replacement suspended December-March 1999 during herring spawning and hatching season
  • To reduce any possible negative effects on the winter run of Chinook salmon and steelhead, there could be no hydraulic dredging in the Bay from November 30-June 1

 

Photo Credit
  1999  /  The Building