Pier1 Team Short

Pier 1 Team Selected

Working with Prologis, SMWM selected a team of design and technical consultants to work together on this new pioneering project:

Rutherford and Chekene–Structural Engineers (Rich Niewiarowski, Alan Kren)
Flack and Kurtz—Mechanical, Electrical and Plumbing Engineers (Reg Monteyne, Allan Montpellier)
Historic Consultant—Page and Turnbull (Jay Turnbull)
Graphic Design—Debra Nichols
Workplace Guru—Fritz Steele
Marine Engineer—Moffatt and Nichols (Bo Jensen)
Underwater Engineer—Power Engineering
General Contractor—Nibbi Brothers (Larry Nibbi, Joe Mazetti)
Construction Manager –Nick Sica
Land Use Attorney—Shepherd Mullin (Bob Thompson)
BCDC Attorney—Mike Wilmar
Architect of Record, Port Offices—TomEliotFisch (Doug Tom)

1998 Read More →
Pier 1 Cross Section

Study of Existing Conditions at Pier 1 — [2 Images]

Prologis and SMWM/Perkins+Will (the wining design team) work to understand the existing conditions at Pier 1 including the exterior building envelope, seismic conditions and existing underwater structural conditions. Via the discovery of poor seismic conditions, and the need to redo underwater structure, the design team decides not to add parking as part of the pier development.

1998 Read More →
SMWM Pier 1 Architectural Site Model

Specific Design Studies at Pier 1 Conclude — [15 Images]

These studies included the expansion of public access as required by the Bay Expansion and Development Commission, fenestration and sustainability (heating and cooling) studies.

1999 Read More →
Pier 1 during Construction

Seismic Upgrades and Construction — [30 Images]

Piles and pile caps are put into place, and construction begins.

1999 Read More →